Skip to main content

How to drag and drop and change order of a block?

G
Written by Gerard Smith

In Narration Box, structuring your narration flow is intuitive. You can easily rearrange the sequence of your speech segments by dragging and dropping text blocks within your project timeline. This guide shows you how to change the order of your blocks to perfect your script's flow.

  1. Open a Text to speech project from your dashboard.

  2. To insert new segments, click the Add block button at the bottom of the list.

  3. Locate the specific block you want to move. On the left side of the block, you will see a drag handle icon (represented by six dots or grip lines).

  4. Click and hold the handle, then drag the block up or down to the desired position in your timeline.

  5. Release the mouse button to drop the block, instantly updating the playback order.

Did this answer your question?